David Marquet: Turn Your Ship Around

imageRegular readers (and clients) know I really like David Marquet’s “Leader-Leader” model and believe it has a synergistic close connection to lean thinking, leadership, and Toyota Kata. When I was offered a chance at getting a pre-publication copy of his Turn Your Ship Around! workbook, I jumped at the opportunity.

Lean Leadership

I don’t like the word “lean” but we are stuck with it, so I’ll use it. I believe “Lean” is really about good leadership.

It’s really tough to make “lean” work beyond a superficial level without the rich horizontal and vertical two-way communication that is created in what David Marquet calls “Leader-Leader.”

While the lean process structure directly supports this type of leadership, our typical approach to “lean” has been to focus on the technical aspects and gloss over the change in behaviors.

Why? It is easier to teach how to build a u-shaped layout, or implement a kanban loop than it is to actually shift people’s day-to-day behavior. A fair number of attempts to use Toyota Kata have fallen into this trap as well – teaching it as a rote technical tool rather than a structure to develop deeper thinking and improve organizational clarity and alignment.

Our numbers-driven management culture tends to shy away from “people problems” and tries to lateral those things to Human Resources. Here’s the test: Who chairs the “difficult conversations” in your organization? Leaders? or HR?

Captain Marquet’s experience in the Navy was similar. A submarine Captain’s authority (in the US Navy) largely descended from his technical knowledge and expertise. Take away or diminish that technical expertise, and he has to learn to rely on the team, and build a team that can be relied upon.

So we are really talking about that elusive “culture shift.”

Empowerment

The word “empowerment” got a really bad name back in the late 1980s. There were tons of books written and consultants pushing managers to “empower their workers.”

They painted a picture of the end state: self directed teams that managed their own work in ways that were far better than anything achievable by top-down direction. There was nothing wrong with the picture – I’ve seen a few examples of that process in action and it is always amazing.

The problem was getting there. Companies would have a kickoff, make a huge change, “empower their workers” and let go of control, and sit back to watch the amazing results.

train

While the intentions were good, when direction was suddenly removed, people didn’t know what to do and they guessed wrong. They had been used to getting the answers from the boss, and suddenly those answers were gone.

The rules and boundaries were not well understood, and frustrated leaders often ended up pulling away even more control than they had held before the experiment.

“Well that didn’t work” became the words attached to “empowerment.”

So why does it work in the places where it does? It is surprising to me how often I hear leaders cite exceptionalism. “They can hire better people.” for example, without thinking about what that means about their own leadership, people development or hiring processes.

David Marquet lays out a few key principles in his Leader-Leader model. He is clear (to me) that this isn’t a switch you can suddenly throw. His journey on the Santa Fe was one of discovery as he navigated unknown territory. There were successes and setbacks, each a point of learning.

The main points of the model are progressively giving control; building competence; and establishing clarity.

In the words of Toyota Kata, establish a next target condition for pushing control and decision making down a level, then identify the obstacles in the way and progressively and systematically address them.

Those obstacles are nearly always something we must teach (competence); or something we must communicate (clarity).

There are some previous posts on the topic that you can click through to review so I don’t cover it all again here:

With all of that background, let’s talk about the book.

Turn Your Ship Around!

The first thing to understand is this book does not stand alone. The reader must be familiar with the original book Turn the Ship Around!, its story and premise, or at least have that book available to provide context for he workbook. I have read the original book three times, and was still flipping back through it as I went through the workbook.

imageThe workbook also refers you to several scenes in the Russell Crowe movie Master and Commander: The Far Side of the World as examples (actually counter-examples) of the Leader-Leader model.

The format of the original book, Turn The Ship Around is a series of stories and experiences on board the Santa Fe. Each described a challenge or problem and what the crew and leaders leaned about leadership in overcoming it. Then the general principle is described. The chapter ends with a series of bullet point questions for a leader to ask himself.

The workbook, Turn Your Ship Around! parallels the structure of the main book. Each chapter in the workbook emphasizes a key leadership principle, references specific pages in the original book for the reader to review, then asks a series of questions or (in some cases) proposes an activity, exercise, or “to do” with your organization.

The questions are improved versions of the end-of-chapter questions in the original book.

There is also some additional material that Marquet has developed since writing the original book, for example, his “Ladder of Leadership” model that focuses you on the language in the conversation as leaders are developed.

I’ll get more into that on another post.

Using Turn Your Ship Around!

As I mentioned above, this is a companion work for the original book. Many management teams conduct book study sessions, and this workbook would provide a great structure: Study a chapter and go though the pertinent section in the workbook individually, then come together and share your impressions and answers to the questions.

Other Material

My review copy also came with a deck of cards intended for structuring a role playing session. A scenario is drawn, and individuals representing the leader and the subordinate draw cards which lay out the language they should use.

Sometimes the leader might be trying to get a reluctant team member to step up and take more responsibility. Another scenario might have the team member showing more initiative than the leader is comfortable with. The idea is for the participants to experience how these various dynamics feel. I haven’t tried it with a group (yet), but it seems like it would be worth doing… with the caveat below.

The Caveat

There’s an old joke out there that goes “How many psychiatrists does it take to change a light bulb?” Answer: “Just one, but the light bulb has to want to change.”

Trying to Change the cultural dynamic of your organization is going to challenge deeply hidden assumptions about people that are firmly entrenched in the mechanics and artifacts the organization uses to get things done. These are things like reports, the way meetings are run, how assignments are given and tracked. If you choose to go down this road, all of those things will be challenged, and you will need to be open to that.

Capt Marquet talks specifically about blowing up the reports, tracking files, chains of signatures during his journey on the Santa Fe. No matter what you say your values and beliefs are, the mechanisms of control define what your culture really believes about who can be trusted with what. This won’t work if you pay lip service to it.

More to Come

Though I’ve been talking this up to clients for the better part of a year (and probably “sold” a hundred or so copies of the book in the process), I haven’t gone into a lot of depth here. I’ll likely be digging into the concepts more in the future. This post is about the new book, so I want to try to constrain myself somewhat to that topic today.

How Does Kaizen Differ From A Kaizen Event?

The title of this post is a search term that hit the site today. It’s an interesting question – and interesting that it gets asked.

“Kaizen” is now an English word (it’s in the OED) and defined as such:

Definition of kaizen in English:

NOUN

A Japanese business philosophy of continuous improvement of working practices, personal efficiency, etc.

Origin

Japanese, literally ‘improvement’.

 

Let’s talk a bit about that “Japanese, literally ‘improvement” bit.

Jon Miller of the Kaizen Institute was raised in Japan and offers up this nice breakdown of the meaning behind the meaning:

image

Jon explains:

•Kai = Change is made from two characters “self” and the picture “to whip”. You can see the stripes across the poor fellow’s back.So Change is something you do to yourself.

•Zen = Good. In this case a sacrificial lamb which means “righteous” is offered between two characters for “word”. In this case word = clear and precise speech. So good sacrifice with precise speech all around it is “Good”. The Zen character we are using today is a simplified version. Also, Zen in this case is not the same character as Zen Buddhism.

•Kaizen = Change for the better. Or in our case whip yourself so that you can make a nice sacrifice and always have clear speech / thoughts surrounding you. Smile

As I understand it, in vernacular Japanese, “kaizen” is regarded as a business term. The word is not used in day-to-day context.

From Jon’s explanation, there is also a very personal aspect to it. Change is something you impose on yourself.

With all of that, “kaizen” is simply a word that generally refers to any systematic disciplined activity of improvement.

Kaizen Events

Now things get tricky, because here in the West, we have often regarded “kaizen events” and “kaizen” as the same thing. They aren’t. While you can certainly make improvements with kaizen events, that isn’t the only way to improve things, and I’ll add it isn’t necessarily even the best way.

A typical Western kaizen event (and there are lots of variations, though most companies that use them tend to impose fairly rigorous attempts to standardize them) is a 5 day focused effort with a 100% dedicated team.

The kaizen event leader is usually a specialist whose job is to plan and lead these things, identifies an improvement opportunity. He might be tasked by shop floor management to tackle a chronic or painful problem, or might be executing the “lean plan” that calls for a series of implementation events.

It is his job to plan and execute the event and to bring the expertise of “how to make improvements” to the work force and their leaders.

Here’s the Problem

The full-time kaizen event leaders typically get really good at seeing improvement opportunities, organizing groups for improvement, and quickly getting things done. They get good at it because they do it all of the time.

The area supervisors might be involved in a kaizen event in their area a few times a year if that. Some companies target having each employee in one kaizen event a year.

That’s 40 hours of improvement. All at once. The question is: What do they do (and learn) the other 1900 hours that year?

What do they do when something unexpected happens that disrupts the flow of work? Usually kaizen events don’t deal with how to manage on a day-to-day basis other than leaving an expectation for “standard work” in their wake.

But “standard work” is how you want the work to go when there aren’t any problems. When (not if) there are problems, what’s supposed to happen?

This is why many shop floor leaders think “kaizen” is disconnected from reality. Reality is that parts are late, machines break, things don’t fit, Sally calls in sick, and the assembler has to tap out threads now and then. In the hospital, the meds are late, supply drawers have run out, and there is a safari mounted to find linens.

These things are in the way of running to the standard work. They are obstacles that weren’t discovered (or were glossed over as “resistance to change”) during the workshop.

The supervisor has to get the job done, has to get the stuff out the door, has to make sure the patients’ rooms are turned over, whatever the work is. And nobody is carving out time, or providing technical and organizational support (coaching) to build his skills at using these problems as opportunities for developing his improvement skills, and smoothing out the work.

So… sometimes, “kaizen events” implement changes, but don’t necessarily do much for that personal drive for improvement.

The Shift

We’re starting to see a shift, as we realize those front line leaders are actually the ones who need to be the experts. That’s where Toyota Kata comes in – as a tool to learn to coach those leaders so they learn to keep the improvement going rather than just fighting erosion and working around problems.

OK – it’s late, and this was actually a diversion from something else I’m working.

“What Is Lean” – 2015

Mike Rother and Jeff Liker have refined the “What is Lean?” slideshare from earlier this year. I think they have filled things in pretty well. Take a look, then I’ll add my thoughts.

Responsibility of Leaders

The Jim Womack quote on Slide 4 is telling in a number at a number of levels:

“Most management decided they could outsource lean…

‘ Please go do it, here’s your budget, and please get some results, we won’t be too precise about that, and now I will be on to the next issue.’ And of course that is unlikely to produce much a result… It produces something, but it doesn’t produce what we had intended, which was that this would become the core way that managers think.”

I had a friend in the Army who (with a smile) would say “An action passed is an action completed.” These managers believe that as long as they have assigned someone to work on the problem, their responsibility is to getting updates on progress and authorize or question budget requests, then moving on to the next agenda item.

Even today I see very real “We have to do this to survive as a company” levels of urgency behind initiatives, but they are still assigned to mid-level staff people as though engineering a fundamental shift in the organization’s ways of working can be done with mere oversight of the top level leaders.

Actual Customers

While we (the lean teachers, community) have done pretty well over the years is talk about establishing flow. What we haven’t done as well is with the words “toward a customer.”

Never Ending Struggle

The problem with “lean implantation plans” is they, by their very nature, have a point when they are “done.”

Human cultures throughout history have their legends built on what Joseph Campbell called the Hero’s Journey, and our implementation plans are built around the same pattern.

  1. The need for change. (often first met with refusal or denial)
  2. Commitment / crossing the threshold.
  3. The Mentor Figure (“find a sensei”)
  4. Assembling the team.
  5. The Quest / Journey of Adventure
  6. Final Confrontation
  7. Returning with “the elixir” / the journey home
  8. A changed life and/or a changed world.

While there are lots of variations on how this is described, this is the pattern of just about every business novel, every script in Hollywood, and our most compelling stories.

But these stories always have an end – where things are “changed” and a new stability. And our “implementation plans” imply the same expectation – that there is a “new normal” where everyone can relax because we’ve gotten there.

The Problem as I See It

The model outlined in this slideshare runs against the grain of everything business executives are taught. I think it is great that we are starting to realize what is really behind truly great organizational performance, but it’s still too easy to dismiss as an outlier when it happens. The “Lean Community” has a lot of momentum behind the “implement the tools” paradigm, and the idea that establishing and enforcing standards for the improvement boards and forms is somehow the key to success.

Let’s challenge the paradigm. Right now the biggest “change” we need to make is us.

 

The Personal Challenge of One-by-One

I got a cool model kit of the 1903 Wright Flyer for Christmas, and am in the process of assembling it. Each wing (top and bottom) has two spars connected by 38 ribs. (To give you a sense of the size, the wingspan of the model is just over 30 inches).

FlyerModelWing

Each of the 38(x2) ribs requires the following steps:

  1. Cut the laser cut part from the sheet.
  2. Sand the ends smooth with an emery board. Fit check between the spar.
  3. Sand the burned wood from the top edge with an emery board (outside curve).
  4. Sand the burned wood from the bottom edge (inside curve) with a piece of fine sandpaper wrapped around a round hobby knife handle.
  5. Sand the burn marks off the flat side with the emery board.
  6. Glue the front end to the front spar.
  7. Glue the back end of the previously done rib to the rear spar. (give the front glue joint time to set)

It was amazingly tempting to just cut them all out, the sand all of the ends, then sand all of the top edges, then sand all of the bottom edges, then sand all of the flats, then glue them all into place. That would have felt like it was faster.

But no matter what order I did it in, I had to repeat steps 1-7 38 times, there wasn’t any way around that. And yes, I picked up, and put down, the tools and glue bottle 38 times by doing it 1:1. But I also picked up on mistakes that I had made only once, and could check and adjust my technique as I went to ensure everything was fitting together the way it should be.

I could also more easily cut things loose when a little glue stuck the spar to the jig. It’s easier to get the knife under one stuck rib. (I only glued my fingers to the wood a couple of times, and only just a little. *smile*).

I know this is old stuff to most of my readers, but sometimes it is good to come back to the fundamentals and experience that 1:1 feels slower even though it isn’t.

Smart People Making Good Decisions and Killing Growth

Probably without realizing it, Clayton Christensen takes us (the “lean community”) to task in this talk about investment and growth.

We have been “selling” continuous improvement – in all of its forms whether we call it “lean” or Six Sigma, or Theory of Constraints, or Total Quality Management as a cost reduction tool for so long that most managers out there believe that is all it is for.

In this talk, which I got from Mike Rother’s YouTube channel, Christensen makes the distinction between market creating innovations, which create demand where none existed; sustaining innovations, which improve the product, but don’t create new customers; and efficiency innovations which allow us to do more with less.

In Christensen’s view (which I happen to support), the only one of these which creates growth in the economy is a market creating innovation.

Growth stagnates because efficiency innovations show much better short-term return on key metrics.

Take a look at the video, then let’s discuss where we need to go with this.

In a market where there are two or three stable players, without breakthrough market creating innovations, they can only “grow” by taking market share from one another. This dictates a strategy of becoming very good at sustaining innovation (making your product better) and efficiency innovation (so you can sell it at a competitive price).  These are important, because they are required for survival which is, in turn, required to fund market-creating innovation.

Because the vast majority (not all, but most) of continuous improvement effort is focused inward, it tends to work in these areas – improving existing products, improving operations.

We do have the “Lean Startup” movement that is hacking out space for true market creating or disrupting innovation. The question (and I don’t know the answer) is how do established companies get past their completely rational financial decision making and pull that “seek new customers” thinking into their portfolios? The only companies I know who are doing this are privately held, and actually run by the owners (vs. private equity owners)… and I’ve seen a couple of privately held companies turn away game changing ideas as well for fear of cannibalizing their other products.

Apple has been the exception. It’s too early to tell if that exception was actually Apple or just Steve.

Maybe that’s the normal business cycle. What are your thoughts?

Goal vs “Target Condition”

Emily sent an email asking “how would you describe the difference between GOAL and TARGET CONDITION?”

I end up on this topic enough that I thought I’d discuss it here.

I am assuming we are referring to the “Toyota / Toyota Kata” context here. I mention that because while “target condition” has a pretty clear meaning in that context, we have to rely on the everyday meaning definition for “goal.”

Thus, I can’t objectively say “goal” means this, or doesn’t mean that because it means whatever it means to you.

Still, I can give it a try.

I have drawn on the following analogy frequently because I think it demonstrates the concept pretty well.

“I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the Moon and returning him safely to the Earth.”

I’d say that was a goal. It is a specific accomplishment that is clearly “done” or “not done” and it has a deadline. (Someone else once said “a goal is a dream with a deadline.”)

For those of you who don’t remember Woodstock*, let me provide some context.

President Kennedy made that speech on May 25, 1961.

imageOn May 5th, Alan Shepard had been launched into a sub-orbital space flight giving the USA a total manned space flight experience base of about 15 minutes. The previous month, the Soviet Union had launched Yuri Gagarin for a single orbit around the Earth, thus the entire planet had a total manned space flight experience of just under 2 hours (but the Russians weren’t sharing).

<— This is the best we could do.

The goal was selected for political and technical reasons. We had developed a huge rocket engine needed to do the job, and didn’t think the Russians larger rockets would scale well. So the Administration selected a goal they thought the U.S. could accomplish but believed the USSR would have a tougher time with. (They were right.)

At the time the speech was made, there were two competing approaches in play for landing a man on the moon.image

Both involved landing a large upper stage intact on the moon, then lifting off and using the whole thing to return to Earth.

The problem was thought to be how to get that huge moon landing rocket off the Earth and to the moon.

There were a couple of ideas kicking around at the time.

One was to build a huge rocket, maybe twice the size of the Saturn-V that eventually was used for Apollo 11.

imageThe design was never finalized, but the concepts were all lumped together as the “Nova” rocket. You can see the 36 story tall Saturn V (the biggest rocket ever built and launched) as the second from the right in this picture. The idea was to send the entire thing directly to the Moon with a single launch. This was called the “Direct” approach.

Given that building the Nova rocket (not to mention the launch facility) was likely to be…um…really hard, the other idea was to use multiple launches of something more like the Saturn rocket, and assemble the moon rocket in low Earth orbit, then send it on its way. This was called “Earth Orbit Rendezvous.

All through the late spring and summer of 1961 this debate was raging within NASA. Wernher von Braun, our chief “rocket guy” wanted this capability for a large lunar payload because he was interested in establishing bases and serious exploration of the moon. But that wasn’t the objective right now. It was get there fast and beat the Russians.

Another NASA engineer, John Houbolt had what was considered a bit of a high-risk (bordering on crackpot) scheme of a smaller-but-still-huge rocket, single launch, sending an expendable two-stage lander to the moon, having it land with two astronauts, then lift off and rendezvous with the return ship in lunar orbit. Not surprisingly this scheme was known as “Lunar Orbit Rendezvous.” It was risky because what was thought to be the trickiest part, the rendezvous and docking, was to be done 250,000 miles from the safety of Earth, with no way home if it didn’t work.

You can read the whole story here.

By the fall of 1962, Lunar Orbit Rendezvous had emerged as the only viable scheme to accomplish the goal by the deadline.

At the program level, they now had a target condition: How the process should operate in order to accomplish the goal. This does not mean they had worked out every detail. It only means they knew what they were trying to accomplish. This 1962 NASA film pretty much lays out the concept in as much detail as they understood at the time:

Remember, this is at the high level. But at this level they identified obstacles – things they didn’t know how to do – that had to be cleared in order to reach the target condition.

1) They had to develop the concept into a real rocket capable of pushing 90,000 pounds (and finally 100,000 pounds) into lunar orbit. They also had to develop and built the infrastructure to (according to the initial plan) launch one of these every month.

2) They had to determine if (and how) humans could spend 10+ days in space without psychological or psysiological problems. (Remember, we had no idea at the time).

3) They had to develop a space suit that would allow an astronaut to leave the spacecraft.

4) They had to develop techniques and technology for rendezvous and docking in orbit.

Each of these major obstacles could be, in turn, defined as a goal (or challenge) for the next level down. Project Gemini’s purpose was to test #2, and directly learn about #1 and #2.

imageimage

 

 

 

 

 

 

 

 

And of course, the teams working on developing space suits, developing docking technology, etc. then would set their own target conditions that progressively marched toward their goals or deliverables.

Bring this back to Earth

A goal is something you need to accomplish. It usually doesn’t assign the method, only the result and the “by when.”

A target condition is typically a major intermediate step toward the ultimate challenge. Importantly, it outlines the “how” or proposed approach, though necessarily doesn’t offer up the solutions to the problems.

The goal is “win the game.” The target condition is the game plan. To execute the game plan, we need to develop specific capabilities, or solve specific problems.

One thing the target condition does do is limit the domain of the problems that must be solved. This is critical.

There are always more problems to solve than are solvable with the resources available. By being specific about a target condition, you focus the effort on the obstacles that are actually in the way of achieving the target. As you proceed, you learn, and as you learn, the nature of those obstacles may change. Thus, the obstacles are not a static list of things to do. Rather, they are the unsolved issues that, right now, you think must be dealt with.

See this (largely redundant) post from a couple of years ago for another perspective. (oops – just realized I’d already used the Apollo analogy. Oh well. At the time all of this was going on, I was the geeky 12 year old who knew (and would talk endlessly about) every dimension, rocket engine nomenclature, fuel burn rates, etc. of the Saturn-V rocket.)

Hopefully this will spark some discussion.

———–

*If you actually remember being at Woodstock, then you likely weren’t there.  Winking smile

Shifting Perspective from Getting Results to Developing People

Note: This post has been in my “Draft” queue for a few months, so actually pre-dates the previous one. But I’m seeing a theme developing in what I am paying attention to lately.

Taken from an actual conversation.

“What is your target condition?”

“To get [this productivity metric] from 60% to 85%.”

(thinking) – he is only talking about the performance metric.

“How would the process have to work to achieve that level of performance?”

(pointing to process flow diagram) “We have two work flows. One for routine project work, the other is high-priority emergent work. Whenever a worker has an opportunity to take on routine project work, I want him to be able to take the next most important job from the prioritized work queue.”

“This would eliminate the need for the worker waste time trying to find me to get an assignment or investigate or guess what he should do next, and let him get started right away. It would also stop cherry picking the easier jobs”

“My goal is for the Team Leader to establish those priorities, and keep track of how work is progressing.”

(thinking) – OK, I see where he is trying to go. I’m not sure I would have taken this exact approach, but it looks good enough right now to let him run with it and see what he learns.

“What was the last step or experiment you completed?” (Note: I am trying asking this question with ‘you completed’ so emphasize I want results from the last one, not information about what is ongoing or next.)

“Before I went on vacation, I looked at the incoming work queue, and established priorities for that work. As the workers needed their next job, it was clear to them what they needed to do.”

“What result did you expect?”

“I expected my productivity metric to hit my 85% target.”

“What actually happened?”

“The metric did hit the 85% target, when I prioritized the work. Then I went on vacation, and as you can see here (pointing at the graph), the productivity dropped back to its baseline level.”

“What did you learn?”

“I learned that when I set the priorities, and track the productivity, it improves as I expected it to. I also learned that when I don’t do it myself, then things go back to the way they were.”

“What obstacles do you think are preventing you from achieving your target condition?”

“People don’t know what the most important job is.”

“You said your target condition is for your team leader to make those assignments. How does that obstacle relate back to your target?”

“My team leader doesn’t know what the most important jobs are.”

“How about writing that down on the obstacle list.”

(he adds it to the list)

“Any other obstacles?”

“Um… I don’t think so.”

(thinking) I’m pretty sure there are other issues, but he seems focused on this one. Let’s see where he is going with it.

“OK, so that (the team leader) is the obstacle you’re addressing now?”

“Yes.”

“OK, what is your next step?”

“I am going to assign the priorities myself.”

“What result do you expect?”

“I expect the performance to go back to its target value.”

“How is that addressing the fact that your team leader doesn’t know how to assign priorities?”

pause…

(thinking) He isn’t connecting the dots here.

“Let’s come back to your target condition. You said you want the team leader to do all of this, rather than you, right?”

“Yes.”

“What is keeping you from just giving him the work and having him do it?”

“If I did that the productivity would go down again.”

”How come?” (Yes, I am leading the witness here. My thinking is that if I can get the right words to come out of him, he’ll “get it.”)

“My team leader doesn’t know how to set the priorities.”

“Right, so that’s the real obstacle in the way of reaching your target of having him do it, right?”

“Yes, but if I have him do it, then my productivity will go down. Isn’t the idea to hit the goal?”

“Yes, but you said in your target condition you wanted to hit the goal by having your team leader set the priorities, not just do it yourself.”

pause… (he’s probably feeling a little trapped now.)

(continuing) “So, if your team leader did know how to set the priorities, you think you’d hit your productivity goal with him doing it, right?”

pause…

“What else might be in the way?”

“He (the team leader) doesn’t like to go and talk to managers in other [customer]departments about their work priorities.”

“Write that down. Anything else?”

“He sometimes is reluctant to give assignments to people who would rather be working on something easier [but less important].”

“Write that down. Anything else?”

“I don’t think so. It sounds like the team leader is the problem.”

“You remember the session we did about David Marquet, the submarine captain, right?”

pause… “yeah.”

“So is this an issue with his (the team leader’s) competence – something you need to teach – or clarity – something you need to communicate?”

“I guess I need to teach him how to set the priorities.”

“So that is still the obstacle you are addressing now?”

“Yes.”

“OK, so what step are you going to take first?”

and from here, the conversation took a 90 degree turn into how this manager was going to develop his team leader.

The target condition got clarified into the capabilities and information the Team Leader needed to be able to perform the job competently.

The obstacles turned into things which must be taught, and things which must be communicated.

In retrospect, the obstacle I was addressing was reluctance on the Manager’s part to accept that developing the team leader was nobody’s job but his. But I’m finding that to be a common theme in a few places.

“Why Don’t You Just…”

Most leaders will at least superficially agree that organizations with an aligned, empowered workforce are more effective; that decisions are faster when made at lower levels that are closer to the actual facts; and that work teams are the ones in the best position to improve their own processes.

Most would agree that they would prefer their people to take initiative to come up with the best way to solve a problem.

Here’s a quiz.

Take a look at this old photo (it’s real, not staged!), and try to imagine what you think day-to-day interactions with this commander would be like.

Now… answer this question:

How much day-to-day initiative do you think the four officers in this photograph would show when the boss isn’t right there?

What does he teach them to do when he is talking to them?

Why would we expect they would learn to do anything else other than what they are being taught in the course of those day-to-day interactions?

This is, of course, an extreme case, meant to make a point.

But listen to your day to day interactions with your own people.

Do you give them directions they are expected to follow? Those directions, by the way, can take very innocuous forms. They can be disguised as suggestions, “Why don’t you just…” or “Have you considered…?” as well as just being orders.

You can think you are “correcting” or “teaching” people when your language actually is communicating something quite different.

You are teaching your people every time you talk to them. They will answer the questions you ask. If you make a habit of overriding their ideas, they will learn to not bother to work very hard to develop those ideas. If you argue with them, they will quickly learn to give in, or even just wait until you make up your mind. Any time you are making declarative statements about what should be done you are eroding initiative a little.

Frankly, from their perspective, it is a lot easier to just wait for the boss to give direction and follow it than it is to take initiative. There is much less psychological risk and energy involved. And if the organization has a history of risk-aversion you have an uphill battle to begin with.

It only takes a few negative experiences to stamp out initiative.

A thought experiment:

You wish people would take more initiative, self-organize the right people to work on problems in your organization.

Someone is working on understanding a problem or improvement. They come to you with a fairly decent picture of the current condition, but their next step isn’t the one you think they should take.

You have an overwhelming urge to say “Why don’t you just…” and get to a workable solution fast.

If you do so, what have they just learned?

You cannot simultaneously maintain full control and develop initiative.

Does Your Solution Have A Problem? Does Your Problem Have A Customer?

Javelin.com is a site with a few good tools centered around startup product development. (“Lean Startup”). I really liked their tutorial around the “javelin board” which is a vertical PDCA record specialized for testing product ideas.

In the tutorial, the phrase that really got my attention was this:

“Not all solutions have problems, and not all problems have customers.”

If you are a regular reader, you know one of the questions I ask frequently is “What problem are you trying to solve?” This is especially important if the proposed solution is a “lean tool.” For example, “there is no standard work” is not a problem, per se. I know lots of companies that do just fine, and have more than doubled their productivity before work cycles ever emerged as something to work on. “What obstacle are you addressing now?” is a question we ask in the Coaching Kata to explore the learner’s linkages between the proposed solution, the problem (obstacle), and target condition. The obstacle itself is a hypothesis.

The javelin board process first ensures that (1) you know who the customer is and (2) that you validate that the problem you THINK they have is one they ACTUALLY have… before you go exploring solutions.

Remember as you watch this, though, that the process isn’t different from the Improvement Kata. It is just a specialized variant. The underlying thinking pattern is totally identical… and the problem Toyota Kata is trying to solve is “We have to learn this thinking pattern.” Once you understand the pattern, and apply it habitually, then these variations make perfect sense. On the other hand, if you don’t understand the underlying pattern, then these variations all look like a different approach, and you’ll end up wrestling with “which one to adopt.”

DMAIC and Toyota Kata

A lot of the organizations I deal with have a legacy with Six Sigma, or some x-Sigma variant. If they are now trying to incorporate Toyota Kata as a way to shift their daily behavior, questions arise about how it fits (or might fit, or whether it fits) with DMAIC.

This sometimes comes about when the impetus to embrace Toyota Kata comes from outside the organization, such as an initiative from the corporate Continuous Improvement office. In this case, unless integration with legacy approaches is carefully thought through, Toyota Kata (or whatever else is coming down the pipeline) can easily be perceived as “yet another corporate initiative” or “something else to do” rather than “a new (and hopefully better) way to do what we are already doing.”

My Background

First a disclaimer. My deepest exposure to Six Sigma was during my time as a Quality Director in a large company that had a long history with TQM and then Six Sigma. Thus, I dealt with the Black Belts and Green Belts in the organization, and paid a lot of attention to the projects they were working on.

In addition, every certification project for a new Black Belt came across my desk. Unlike a lot of managers in the chain (apparently), I actually read them, parsed them, and asked questions when I couldn’t follow the story line of the project. (Apparently nobody expected that, but it’s another story.)

I worked with the corporate Master Black Belt, made input into their programs, and did what I could to create a degree of cooperation, if not harmony, between the Six Sigma community and the lean guys.

Thus I am not claiming this is anything new or profound. Rather, this is sharing my own sense of connection between these two approaches in a world where I often find them competing for people’s mindspace.

The Improvement Process Flow

As I observed it, a Six Sigma project was typically organized and conducted as follows:

An area manager, usually a Green Belt, identifies something that needs improving. He assembles a team of stakeholders. He is coached by a Black Belt through*:

Defining the problem and establishing a charter for the team.

Establishing a Measurement that will define progress.

Conducting a thorough Analysis of the process, with a primary focus on sources of variation, especially those which are intertwined with quality issues.

Developing a list or set of Improvements and putting them into place, again focusing primarily on variation in methods, etc. that drive defects.

Establishing a standard to Control the process and keeping it running the new way.

Define, Measure, Analyze, Improve, Control. DMAIC.

In actual practice, it is very similar to the large single-loop “six step problem solving” process I was taught as “the problem solving process that came out of TQM.” That is probably not a coincidence.

DMAIC projects are typically targeted at measurable significant financial payback. Black Belts are trained to find and spend their time on high-payback projects. At least in the company I worked for, there was a minimum payback they had to achieve to get their certification. They also had to demonstrate knowledge of the various high-powered statistical tools.

It makes sense for people steeped in this methodology to ask how it fits in with “short cycles of experiments and improvements” that are the anchor for not only Toyota Kata, but kaizen in general (if you are doing it right).

And, put another way, if the organization is trying to establish a coaching culture using Toyota Kata, is Toyota Kata something different from DMAIC, or do they fit together? (I have actually been asked exactly the same question about Toyota Kata and kaizen(!), but that, too, is another story.)

To give credit where credit is due, this was the topic over lunch last week at a client site whose Six Sigma projects also follow the general structure I outlined above. Jazmin, the continuous improvement leader, was already working through this in her mind, and recognized the linkage right away.

Since the company has an active Six Sigma program, with dozens of projects ongoing, we wanted to find a way to integrate Toyota Kata thinking into what they were already doing vs. introducing yet another separate initiative. (It is easier to “embrace and extend” something you are already doing than bring something brand new into the domain.)

Relating DMAIC to the Improvement Kata

Here is how I relate DMAIC to the Improvement Kata.

Define the Problem =(more or less) Challenge and Direction. This is what we are working on, and why it is important.

Measure and Analyze = Grasp the Current Condition. Six Sigma has a host of powerful tools (which are often used just because they are there … so be careful not to make easy things complicated).

I would point out that if you follow the process in the Improvement Kata Handbook, you are also initially focused on variation in the process. Lean people tend to reduce all variation down to units of time, but in that noise are all sources of variation of the process. Defects, for example, don’t count as a delivery, and so introduce noise into the exit cycles. Machine slowdowns and stoppages, likewise, disturb the rhythm of the process. Like DMIAC, the Improvement Kata, as outlined in the handbook, steers you toward sources of variation very quickly.

Thus, a Six Sigma project team, and an improver following the Improvement Kata are both going to initially look for sources of instability. (Quality First, Safety Always).

At this point, the two diverge a little, but only a little.

Perhaps because DMAIC sounds like a single cycle, a fair number of teams tend to try to Implement a Single Grand Solution. They spend a fair amount of time brainstorming what it should look like, and designing it. Then, once they think they have a solution, they put it into place by establishing new “standards” (in this context, that usually means procedures), training people, and validating that it all works.

Again – a lot of kaizen events do pretty much the same thing, they just might do it faster if it is a classic five-day event.

A few years ago I was on a discussion panel at a conference in Chicago that was very Six Sigma centric. In the various breakout sessions, the Black Belts (who are mostly staff practitioners) universally complained about “management embracing the changes” and not enforcing the new processes. They were frustrated that once they were done, things slipped back.

In other words, once the energy input of the project itself stopped, entropy took over, and things regressed back to the original equilibrium.

And (once again) traditional kaizen events often have the same problem.

Blending Toyota Kata and Six-Sigma Coaching

Think of this conversation between the Black Belt coach and the Green Belt project leader in their daily meeting and check-in:

[preliminary social rituals]

“Just to review, what is the problem you are working on?”

[Green Belt reviews the charter and objective]

“Great, so what is the target condition you are striving for right now?”

[Green belt describes the next intermediate step toward the chartered defined state. He describes how the process will operate when key parts of it are stabilized, for example.]

The Black Belt is listening carefully, and may ask follow-up questions to make sure the target condition is clearly on the path toward solving the defined problem vs. chasing something interesting-but-irrelevant to the issue at hand.

“Good. Can you tell me the last step you took?”

[Green Belt describes a change they made, or some additional data they needed to collect and analyze, or a control measure they have experimented with, etc]

“What did you expect from that step?”

[Green Belt reviews the intent of the action, and what he expected to happen.]

“And what actually happened?”

[Green Belt describes what his data collection and observation revealed about the process, or how well his control measure worked to contain a source of variation, etc…. or didn’t.]

“And what did you learn?”

[Green Belt describes insights that have been gained, especially insights into sources of variation, or the effect of controlling them. He also describes what he might have learned about the tools, or struggled with in applying them.]

“Very good. So what sources of variation or obstacles do you think are preventing you from reaching the target right now?”

[Green Belt describes the current suspects for causes and sources of variation in the process, as well as other issues that may be impeding progress.]

“Which one of those are you addressing now?”

[The Green Belt may well still be working on the last one, or might have it effectively controlled and is now addressing a new one. If he has moved on to a new one, the Black Belt is going to be especially interested in the control mechanism for the sources of variation that has been “eliminated” so it stays that way.]

For example, a follow-up question might be “Can you tell me how you are controlling that? What countermeasures do you have to detect if that variation comes back into play?”

We aren’t limited to SPC of course, and actually would rather have a binary yes/no  need-to-act/don’t-need-to-act signal of some kind.

What we are going here is iterating through sources of variation, and establishing a positive Control on each of them before moving on rather than trying to stabilize everything in one step at the end.

Once he is satisfied that the project team hasn’t “left fire behind them,” then the Black Belt can move on.

“Great. Can you tell me the next step you plan to take, or experiment you’re going to run?”

[Green Belt reviews the next action to either learn more about a source of variation or attempt to keep it controlled.]

“And what result do you expect?”

[If the Green Belt is proposing using a specific Six Sigma statistical cool, the Black Belt is going to be carefully listening, and asking follow-on questions to confirm that the Green Belt understands the tool’s function and limitations, how he plans to use it, what he expects to learn as a result, and why he thinks that specific tool will give him the answers he is looking for.]

“OK, when do you think we can review what you have learned from taking that step”

This interaction is using the Coaching Kata script to develop the Six Sigma skills of the Green Belt project leader. We already have a coaching relationship, so all we are doing here is practicing a technique to make it more effective and more structured.

DMAIC is now more like:

DM [repeat AIC as necessary]

as the team works methodically through the sources of variation as they are uncovered.

The Master Black Belt

At the next level up is typically a Master Black Belt who is generally responsible for mentoring and developing the Black Belts. They typically meet weekly or monthly and review and share progress on projects.

Only now, let’s shift the discussion to reviewing and sharing progress on developing the problem analysis and solving skills of the Green Belts. Remember, the Green Belts are line management, and we want to get them thinking this way about everything.

“Lets review your learning objective for your Green Belt last week.”

“What did he do? What did you expect him to learn?”

“What did he actually learn? Did he make any mistakes?”

“Is he stuck anywhere? What is your plan to give him additional coaching or instruction?”

In other words, they are following DMAIC as well. Except that the “problem” is the skill of the Green Belt and how effectively he is applying that skill to solve his chartered problem.

 

I am really interested in hearing from Six Sigma folks out there about how this resonates, or doesn’t, with you.

————

*Sometimes I observed a Black Belt doing the same thing on his own initiative, leading the project himself. Occasionally I saw a Black Belt acting solo. I am not discussing either of those approaches here, however.